 | Question | |
 | Addenda |
| |
 | Advertisements |
| |
 | Attachment |
| |
 | Bid Package |
| |
 | Bid Results |
| |
 | Bid Tabs |
| |
 | Bonds |
| |
 | Business Partner Registration |
| |
 | Consultant Inspection |
| |
| Are design contracts under this same level of scrutiny? What is their process for... |  |
| Can a higher pay grade be substituted for a lower pay grade without prejudice? (TCM-1 for a TCIS-2) |  |
| Can an inspector be approved for assignment to multiple agreements at the same time? We understand... |  |
| Can consultants simply summarize historic experience on the resume template for old projects if... |  |
| Can or should there be a standard letter requesting relief? |  |
| Can PennDOT Districts and associated IIC be strongly encouraged to use TA's? |  |
| Can relief be granted for the entire agreement or does it have to be for each individual when the... |  |
| Can resumes only indicate a break in service longer than a month? |  |
| Can we submit rate approvals for an entire agreement, rather than by part or by work order? |  |
| Can "TA" classification be added to advertisements? |  |
| Can "TA" classification be staffed on a project regardless of classification being in the |  |
| Do Municipal Projects fall under “Process Control”? |  |
| Do substitutions apply to the alternates listed in an SOI? |  |
| Do the experience and certification substitutions that are associated with P.E. License, CE... |  |
| Does a consultant attain any relief on substitutes when the Dept. hires a consultant employee... |  |
| Does a consultant have to constantly submit new resumes when a cert changes or can the consultant... |  |
| Does a Letter of Interest not selected come under Process Control? |  |
| Does a substitute for a substitute have to meet the requirements of the original or substitute? |  |
| Does PennDOT recognize NICET Engineering Technologist Certification to cover NICET level 2, 3, or |  |
| Does Process control apply to TAs? |  |
| Does the subconsultant’s wage rate request go through the prime in ECMS II workflow? |  |
| How are issues of Districts doing things differently to be addressed? |  |
| How are prime consultants to know if a subconsultant is suspended or under sanctions? |  |
| How is an inspector’s wage rate determined within the wage range? |  |
| How long does PENNDOT have to approve a wage rate? |  |
| If a consultant has to provide an inspector for a short-term assignment (to cover for an inspector... |  |
| If a consultant is unable to provide a “substitute” inspector (equal or exceed qualifications of... |  |
| If all personnel in SOI are utilized on the project and PennDOT requests additional staffing, what... |  |
| If an inspector is requested long after the start of the project, does that inspector have to equal... |  |
| If the Dept. elects to lay-off inspectors, what is the obligation of a consultant in supplying... |  |
| If the Dept. tells a consultant that no staff is required or none of that title will be used and... |  |
| Is it necessary to denote if the employee has a relative(s) who work for PennDOT? |  |
| Most statements in the ECMS-FAQ's or the Process Control language itself refer the NTP date or some... |  |
| Must we list past employers on the resume, or is PennDOT looking for the District on a PennDOT... |  |
| Must we use the word "continuous" on projects where no breaks greater than two weeks occurred over... |  |
| Some Districts are not including specific start dates for 2008 projects. How should we handle those... |  |
| What are the criteria for providing substitute inspectors? |  |
| What happens when an inspector's certification(s) expire during a project. |  |
| What is included in Process Control for Construction Inspection? |  |
| What is PennDOT to do in case of deficient or substandard submissions on the part of a sub... |  |
| What is the definition of “relief” on page 3 of 4, 2a – second paragraph of Proposed Process... |  |
| What is the obligation of a prime in reviewing the resumes and certifications of a sub? |  |
| When submitting for the annual hourly rate increases, for example, on July 1, 2008, do we have to... |  |
| Who determines which people to put on job (select these 4 out of 8) |  |
| Who is allowed to execute a wage rate letter? |  |
| Why is the prime consultant responsible if a subconsultant’s certification runs out during a... |  |
| Will consultants still be subject to refunding money to the Department? |  |
| With regards to substituting using equal or higher pay grade, must it be within the same pay grade... |  |
| With the certification expiration date extension letter dated 12/21/07, what date should be listed... |  |
 | Consultant Qualifications |
| |
 | Consultant Qualifications Package |
| |
 | Contractor Prequalification |
| |
 | Design Build Bid Preparation |
| |
 | Design Build Bridge |
| |
 | Design Build Environmental |
| |
 | Design Build Inspection |
| |
 | Design Build Preliminary Engineering |
| |
 | Design Build Project |
| |
 | Design Build Project Execution |
| |
 | Design Build Review |
| |
 | Design Build Right-of-Way |
| |
 | Design Build Team |
| |
 | Employee Roster |
| |
 | General |
| |
 | General Problems/Troubleshooting |
| |
 | Help Desk |
| |
 | IDM Viewer |
| |
 | List of Contractors |
| |
 | MBE and WBE |
| |
 | Miscellaneous |
| |
 | Price Proposal |
| |
 | Project Questions |
| |
 | Signature Authority |
| |
 | Statements of Interest |
| |
 | Technical Proposal |
| |