Field Name |
State |
Description |
Project Header (Short) |
Display Only |
The short project header provides identifying information about the project. |
Contract Awards Header |
Display Only |
The Contract Awards header is standard throughout the Contract Awards subsystem and appears on each ‘major’ screen. See “Tell Me About Contract Awards Header” for a description of each field. |
Phone (Prime) |
Editable - Required |
The telephone number for the prime contact person. This field must be numeric and must be entered in 999-999-9999 format.
If the prime completed a MBE/WBE Solicitation online form, this field is populated from that screen but can be edited. This feature does not apply to federally funded projects. |
DBE Percentage |
Display Only |
The minimum percentage of the overall contract that PENNDOT has targeted to be performed by disadvantaged businesses (that is, the DBE Goal).
This field is hidden when the project is state funded. |
MBE/WBE Percentage |
Display Only |
The minimum percentage of the overall contract that PENNDOT has targeted to be performed or provided by minority or women-owned businesses (MBE/WBE). Also called the ‘minimum participation level’ (MPL).
The value in this field must be a whole number between 0 and 100.
This field is hidden when the project is federally funded. |
 |
 |
*****MBE/WBE or DBE***** |
BEO Form Status |
Display Only |
The status of the screen. Valid values are:
- Draft
- Awaiting Acknowledgement
- Submitted
- Approved
- Conditionally Approved
- Disapproved
|
Revision Number |
Display Only |
The revision number of the screen. The value of this field is set to ‘0’ when the screen displays the original information. If the BEO Submission Status is changed from Complete to Pending, the revision number is incremented by 1. This allows the submission to be revised after it has been reviewed and marked as complete. |
Type (Subcontractor) |
Editable - Required |
The type of minority or disadvantaged business for which this screen is being submitted. Valid values are:
- MBE
- WBE
- DBE (option changes to "DBE with Joint Venture" or "DBE with Non-DBE Joint Venture", based on apparent low bid)
This field is populated by the information in the Prequalification tables when the user selects the business partner name and can only be edited if the business is listed as both a MBE and a WBE. In this case, the field displays the MBE and WBE radio button group, and the user must select one type to categorize the business. |
Business Partner (Subcontractor) |
Editable - Required |
The name of the sub whom the prime contractor has committed to using for the items indicated.
The user selects one or more subs by clicking the selection arrow to the right of the name and selecting the name from the standard ECMS Business Partner selection window. The selection window displays a list of all registered users, excluding any whose qualification has expired or who have been suspended or disbarred.
If the user selects only one name, they are returned to the DBE Participation or MBE/WBE Commitment detail screen with some information for the selected business partner prefilled. If the user selects multiple business partners, they are returned to the DBE Participation or MBE/WBE Commitment list, where an entry appears for each name. |
Contact (Subcontractor) |
Editable - Required |
The name of the sub’s contact person. |
Phone (Subcontractor) |
Editable - Required |
The telephone number, including area code for the sub’s contact person. This field must be numeric and must be in the format 999-999-9999. |
Certification |
Editable - Required |
The DBE, MBE, or WBE certification number. |
Cert. Expiration |
Editable - Required |
The date the DBE, MBE, or WBE certification expires. |
Agreement Amt |
Editable - Required |
The amount of the agreement between the prime and the sub. This value is used in calculating the overall percentage of the goal or MPL the contractor has achieved.
If the Business Type is "Regular Dealer" and this is a federal project, the "Credit at 60%" field is displayed, and Agreement Amount is multiplied by .60 to determine the DBE percentage. |
Credit at 60% $###,###,###.## |
Display Only |
This field is only displayed when the Business Type (on the form) is Regular Dealer and the project involves federal funds. This value of this field is saved as the Agreement Amount. |
Mobilization |
Editable - Optional |
The portion of the Agreement Amount that will be used for mobilization. |
Starting |
Editable - Required |
The date the subcontractor, supplier, service, or dealer is scheduled to begin work (or provide services/supplies) for the project.
The user enters the date by clicking the Calendar/clock icon to the right of the field. This pops up the ECMS Date Selection tool, which allows the user to select a date using a calendar graphic.
Alternatively, the user can manually enter the date using mm/dd/yyyy format. |
Completion |
Editable - Required |
The date the work, service, or supplies are anticipated to be completed.
The user enters the date as noted above. |
Business Type |
Editable - Required |
This field provides a drop-down list to allow the user to select the type of business. Valid values are:
- Subcontractor
- Manufacturer
- Regular Dealer
- Trucking
- Consultant
- Service
|
 |
 |
*****Items***** |
Item Numbers |
Display Only |
Once the prime contractor has associated an item with this minority business, the item number (unless the item is marked as "partial") appears in the Items section. The Item Number provides a hyperlink to the DBE or MBE/WBE) Item screen, where the user can view or update details about the item. |
Partial Item Description |
Display Only |
Once the prime contractor has associated a partial item with this minority business, the partial item number appears in the Partial Items section. The Item Number provides a hyperlink to the DBE Participation (or MBE/WBE Commitment) Item screen, where the user can view or update details about the partial item. The partial description explains the work or service that will be performed or the supplies that will be provided by the sub. |
Comment |
Conditional |
The comment text for a Conditional Approval. |
 |
 |
*****Workflow***** |
Status (Beginning) |
Display Only |
The status of the form prior to the action. |
Name |
Display Only |
The name of the person who took the action. |
Disposition |
Display Only |
The action taken. |
Date/Time |
Display Only |
The date and time of the action. |