Field Name |
State
|
Description |
Project Header (Short) |
Display Only
|
The short project header provides identifying information about the project. |
Contract Awards Header |
Display Only
|
The Contract Awards header is standard throughout the Contract Awards subsystem and appears on each 'major' screen. See "Tell Me About Contract Awards Header" for a description of each field. |
Total Project Estimate |
Display Only
|
This field displays the total estimate for the project. This value is calculated by summing the item totals (Quantity * Unit Price) for the design items. |
Percentage Difference |
Display Only
|
The system-calculated difference between this bid and the Total Project Estimate, expressed as a percentage. |
Total Number of Bids |
Display Only
|
The number of bids that were opened for the project. |
Estimate Position |
Display Only
|
The ranking, or position of the estimate among the top five bids. |
Rank |
Display Only
|
This column indicates the ranking of this bid within the 5 bids with the lowest total bid price. The bid ranked #1 is the 'apparent low bidder'. |
Bid Amount |
Display Only
|
The total bid price for the associated bid. This field is formatted as currency in dollars and cents. |
Percentage Difference to Apparent Successful |
Display Only
|
The percentage difference between the low bid and the second, third, fourth and fifth lowest bidders. |
Level of Competition |
Display Only
|
A score indicating the number of bids having a maximum difference of 20 percent. |
Estimate/Low |
Display Only
|
A score based on the percent difference between the estimate and the bid amount of the apparent low bid. |
Overrun |
Display Only
|
A score based on the difference between the apparent low bid and the second bid. The highest score (20) is assigned if the difference is 10% or less. |
Underbidding |
Display Only
|
A score based on the position of the apparent low bidder as compared to the estimate. |
Overbidding |
Display Only
|
A score based on the percentage difference between consecutive pairs of bids. |
Total |
Display Only
|
The weighted average score. |
Bid Justification Needed |
Display Only
|
This field indicates whether the project must go through the Bid Justification process.
Note: The process itself, that is, the back-and-forth discussions, documentation, and meetings between the involved parties is outside of ECMS; although the final outcome determines whether the Bid Justification checklist item status moves from Failed to Passed.
|