Field Name |
State |
Description |
Project Header (Short) |
Display Only |
The short project header provides identifying information about the project. |
Contract Awards Header |
Display Only |
The Contract Awards header is standard throughout the Contract Awards subsystem and appears on each ‘major’ screen. See “Tell Me About Contract Awards Header” for a description of each field. |
Minimum Percent Difference with Respect to Project Total |
Editable - Required |
The minimum percentage difference that was used by the system to generate the report. The user may enter a new percentage difference in this field and click the Refresh button to update the report content. If the user enters a new percentage difference and does not click the Refresh button, the data display is not updated.
The default percent values that the system uses to generate the report depend on the total project estimate:
If the Estimate is less than $40 million, the percent difference is 1%.
If the Estimate is greater than or equal to $40 million, the percent difference is 0.5%.
This field is protected after the Line Item Profile has been approved or disapproved. |
Report Status |
Display Only |
The status of the report. Valid values are Draft, Approved, and Disapproved. |
Total Project Estimate |
Display Only |
The total project estimate for the cost of construction, in dollars and cents, this figure is calculated by summing the item totals for the design items. |
Name of Bidder 1 |
Display Only |
The business partner name of the apparent low bidder. |
Name of Bidder 2 |
Display Only |
The business partner name of the second-ranked bidder. |
Name of Bidder 3 |
Display Only |
The business partner name of the third ranked-bidder. |
% Difference Estimate and Low Bid |
Editable - Required |
The percent difference between the total project estimate and the total bid amount of the low bid.
This is a required field when clicking the Refresh button.
Calculation: (Low Bidder Bid Amount – Project Estimate Amount) / Project Estimate Amount. |
% Difference Estimate and Low Bid |
Display Only |
The percent difference between the total project estimate and the total bid amount of the low bid. |
Item |
Display Only |
The item number. |
Description |
Display Only |
The item description. |
Modified Description |
Display Only |
The modified description is displayed in parentheses beneath the standard description for modified standard items. |
Quantity/UOM |
Display Only |
The quantity of the item, followed by the unit of measure. |
Bid |
Display Only |
The rank of the bid. "Est" represents the total project estimate. |
Unit Price |
Display Only |
The unit price of the item. For the Estimate column, this is the unit price taken from the Design Items list. For the bids, this is the unit price taken from the schedule of prices for the bid. |
Item Total |
Display Only |
The item’s total price as calculated by multiplying the quantity by the unit price. |
% Difference WRT (with regard to item) Item |
Display Only |
The percent difference with regard to the item total. |
% Difference WRT Project |
Display Only |
The percent difference with regard to the project total. |
Total Number of Project Items |
Display Only |
Total number of items in the Design Items list. |
Total Number Included in Report |
Display Only |
Total number of items included in this report. If the report is refreshed using zero percent, this figure matches the total number of project items. |
Project Estimate $ in Report |
Display Only |
The dollar amount of the project items included in the report. |
1 Bid $ in Report |
Display Only |
The dollar amount of the apparent low bidder’s items included in the report. |
2 Bid $ in Report |
Display Only |
The dollar amount of the second-ranked bidder’s items included in the report. |
3 Bid $ in Report |
Display Only |
The dollar amount of the third-ranked bidder’s items included in the report. |