Field Name |
State
|
Description |
Project Header (Full) |
Display Only
|
The full project header fields are displayed as a standard throughout much of ECMS. The header displays general project information including Project number, Short project description, District number, County, Project Status, SR, Section, Municipality, Group and Admin Org Code.
The header also provides quick navigation to other screens related to the same project:
Contractors click the word "Project" to navigate to the Contractor Project page. The words "Project Team" take Contractor users to the Third Party Project Team screen.
PENNDOT, FHWA, Municipal, and Consultant users click the word "Project" to link to the Project Information or Construction Project Information screen (depending on Project Status). The words "Project Team" take these users to the Project Team screen.
The header also provides a 'fast path' to the same screen for a different project number. Users navigate by typing the destination project number in the Project field (next to the Project link) and clicking the GO button.
|
Status |
Display Only
|
The status of the Authorization. Valid values are:
- Draft
- Contractor Review
- PENNDOT Review
- Accepted
- Work Not Completed
|
Authorization |
Display Only
|
A system-assigned sequential number that identifies the authorization. |
Work Order |
Optional
|
This field allows the user to select one or more work orders from a list of work orders associated with the project that are in Draft or Revise status. If no such work orders exist, the user receives a 'no records found' message when they click the selection arrow next to this field.
If the authorization screen was accessed in create mode by using the Add links on the Work Order screen, this field is pre-filled with the associated work order number, but the user may associate additional work orders.
When an associated work order exists, the Work Order number in this field provides a link to the Work Order screen. Note that if the work order is in Draft status, the link is disabled for the contractor.
|
Associated Authorizations |
Optional
|
This field allows the user to select one or more Authorizations to associate with this Authorization. |
Document |
Display Only
|
This field indicates whether the authorization is electronic or an attachment. As of Release 15 of ECMS, all authorizations must be created online. In create mode, this indicator is set to "Electronic" and cannot be edited. |
To |
Display Only
|
The business partner name of the prime contractor. |
Work Type |
Required
|
The type of work covered by the authorization. The user checks one or more work types by selecting the checkbox. At least one of these checkboxes must be selected before the Authorization can be saved. |
Scope of Work |
Required
|
This field allows the user to enter a scope of work statement describing the work covered by the authorization. It is a required field. Once the authorization is submitted to the contractor, this field is protected. |
Working Days |
Required
|
This field allows the user to enter an estimated number of working days that the authorized work will require. The value in this field does not change the project number of days for the contract. Any change to the project number of days must be submitted via a Time Extension. |
Calendar Days |
Required
|
This field allows the user to enter an estimated number of calendar days the authorized work will require. The value in this field does not change the project number of days for the contract. Any change to the project number of days must be submitted via a Time Extension. |
EDMS Link |
Link
|
The user may attach an EDMS (Electronic Document Management System) document using the SEL EDMS button. Once attached, the EDMS document can be viewed when the user clicks the doc link, or can be removed using the REMOVE button. |
Scope of Work |
Optional
|
This field allows PENNDOT to enter a detailed description of the scope of work covered by the authorization. |
 |
 |
*****Items*****
|
Item |
Link
|
The item number associated with the authorization item. This field provides a link to the authorization item detail screen. |
Type |
Display
|
This field displays the item type. If this is an original contract item, the field is blank. |
UOM |
Display
|
The unit of measure for the item. |
Estimate Qty |
Display
|
The estimated quantity of the item. |
Unit Price |
Conditional
|
If this is a contract item, the unit price cannot be edited. If this is a non-contract item (for example, an extra work item), the contractor must enter the unit price before accepting the authorization. |
Total Amount |
Calculated
|
The total amount is calculated as the Estimated Qty times the Unit Price. |
Negotiation |
Drop-Down
|
This field provides a drop-down list for users to status the item as part of the negotiation process. The Contractor may select a negotiation status based on whether the item is a contract item. For contract items, valid statuses are Accept and Reject.
PENNDOT may update the negotiation status to one of the following: Accept, Reject, Force Account.
|
Description (unlabeled) |
Display
|
Below the UOM field, the item description is displayed. If this is a modified standard item, the modified description is displayed in parentheses following the standard description. |
 |
 |
*****Special Provisions*****
|
Index/Category |
Display
|
For standard special provisions, the Index/Category letter is displayed as part of the Special Provision Name. For example, a provision from the General Provisions index begins with the letter "G". Authorization-specific special provisions display '00 - ' in place of the Index/Sequence ID/Revision. |
Sequence ID |
Display
|
For standard special provisions, the sequence ID is displayed as part of the Special Provision Name. |
Revision |
Display
|
For standard special provisions, the revision letter is displayed as part of the Special Provision Name. |
Provision Name |
Link
|
The name of the special provision. For authorization-specific special provisions, the provision name is prefixed by '00 - '; for standard special provisions, the provision name is prefixed with Index/Sequence ID/Revision (for example, 'G32000A - '). |
Item Number |
Display
|
The authorization item numbers associated with the special provision. If multiple items are associated, they are separated by commas. Note that this field does not provide links. To view the Authorization Item detail screen, the user clicks the Item Number link in the Authorization Items section.
Note: Only the Authorization Items are shown. Some of the original contract items shown on the authorization may have construction special provisions associate to them. These are not displayed on this screen. To view them, the user must link to the Authorization Item detail screen. From there, the original construction special provision may be viewed or can be accessed for modification via the authorization. |
 |
 |
*****Workflow Status Information*****
|
Status |
Protected
|
This field displays the status of the authorization prior to the action taken by the specified user. For example, when the authorization is saved, this field displays "Draft", and the Name field displays the user name of the person who created the authorization. |
Name |
Protected
|
The name of the person who performed the action listed in the Disposition column. |
Disposition |
Protected
|
The disposition of the authorization performed during this workflow step. For example, Draft, Contractor Review, Accepted, etc. |
Date/Time |
Protected
|
The date and time the user dispositioned the authorization. |