Approve Bid Package

<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN"
"http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
<html xmlns="http://www.w3.org/1999/xhtml">
<head>
<meta name="generator" content="HTML Tidy, see www.w3.org" />
<title></title>
</head>
<body>
<h2 class="form">Description</h2>
<blockquote>
This function is part of the Electronic Bidding subsystem and is used by authorized PENNDOT and FHWA personnel to review and approve the plans, specifications, and estimate (that is, the &quot;Bid Package&quot; ) for a project. The need for prior approval of a bid package is dictated by a combination of the Federal Project Status and a manually set indicator on the project. The matrix below shows the workflow based on all possible combinations. Note that each time the user submits or approves the bid package, an email is generated and sent to the next user group in the workflow. If the user disapproves the bid package, it reverts to the previous status, and an email notification is generated and sent.
<p>The Bid Package/Addenda Workflow screen tracks the user name, date, time, and disposition throughout the workflow process; it can be accessed via the Bid Package status link on the Bid Package screen.<br /><br />The Approve Bid Package function can be accessed by the appropriate user group, depending on the Bid Package status. Users may access the Bid Package screen from the link contained in the notification email, from the Bid Packages by Status screen, or from the Go links of any project-related screen. The Approve button is only available to the user group corresponding to the workflow status.<br /><br />While the bid package is in draft or review status, a draft Original (or Current) Proposal Report .PDF file can be generated on an ad-hoc basis by internal users. After publication, the Original Proposal Report .PDF document can be accessed by all users.<br /></p>
</blockquote>
<h2 class="form">Approval Workflow</h2>
<blockquote>
<table border="1">
<tbody>
<tr valign="top">
<td width="151"><strong style="font-family: Arial; font-size: 80%">Federal Project Status</strong></td>
<td width="75">
<div style="font-family: Arial; font-size: 80%; font-weight: bold; text-align: center">QA Indicator</div>
</td>
<td width="434"><strong style="font-family: Arial; font-size: 80%">Workflow (Status)</strong></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Federal Oversight</td>
<td width="75">
<div style="font-family: Arial; font-size: 80%; text-align: center">N/A</div>
</td>
<td width="434"><span style="font-size: 80%">District creates bid package (Draft)</span><br /><span style="font-size: 80%">District submits to BOD CMD (BOD CMD Review)</span><br /><span style="font-size: 80%">BOD CMD Approves (FHWA Review)</span><br /><span style="font-size: 80%">FHWA Approves (Approved)</span><br /><span style="font-size: 80%">District or BOD CMD Publishes (Pending Publish)</span></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">PennDOT Oversight</td>
<td width="75">
<div style="font-family: Arial; font-size: 80%; text-align: center">No</div>
</td>
<td width="434"><span style="font-size: 80%">District creates bid package (Draft)</span><br /><span style="font-size: 80%">Optional District Contract Management review (Draft)</span><br /><span style="font-size: 80%">District Publishes (Pending Publish)</span></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">PennDOT Oversight</td>
<td width="75">
<div style="font-family: Arial; font-size: 80%; text-align: center">Yes</div>
</td>
<td width="434"><span style="font-size: 80%">District creates bid package (Draft)</span><br /><span style="font-size: 80%">District submits to BOD CMD (BOD CMD Review)</span><br /><span style="font-size: 80%">BOD CMD Approves (Approved)</span><br /><span style="font-size: 80%">District or BOD CMD Publishes (Pending Publish)</span></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Non-Federal (State)</td>
<td width="75">
<div style="font-family: Arial; font-size: 80%; text-align: center">Yes</div>
</td>
<td width="434"><span style="font-size: 80%">District creates bid package (Draft)</span><br /><span style="font-size: 80%">District submits to BOD CMD (BOD CMD Review)</span><br /><span style="font-size: 80%">BOD CMD Approves (Approved)</span><br /><span style="font-size: 80%">District or BOD CMD Publishes Pending Publish</span></td>
</tr>
</tbody>
</table>
</blockquote>
<br />
<h2 class="form">Step-by-Step Directions</h2>
<blockquote>
<p>&nbsp;</p>
<table border="1">
<tbody>
<tr valign="top">
<td width="151"><strong style="font-family: Arial; font-size: 80%">User Action</strong></td>
<td width="439"><strong style="font-family: Arial; font-size: 80%">Result</strong></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Navigate to the ECMS website.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The ECMS Welcome page appears displaying the login link and the navigation bar on the left side.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Using the Registered Users Login fields at the top of the navigation bar, enter your user ID and password. Click GO or tap the Enter key.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The ECMS Welcome page appears. Your user name now appears at the top of the navigation bar, and the navigation bar options are tailored to your security group(s).</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Select the Contractor Services option from the Navigation bar.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The Contractor Services options are displayed.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Select the eBidding option from beneath Contractor Services on the navigation bar.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The Electronic Bidding home page is displayed.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Click the &quot;Bid Packages by Status&quot; link.</td>
<td width="439"><span style="font-family: Arial; font-size: 80%">The Bid Packages by Status screen is displayed.</span></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Locate the Bid Package you want to review and click the associated &quot;Project&quot; number link to open the Bid Package</td>
<td width="439" style="font-family: Arial; font-size: 80%">The selected Bid Package screen is displayed.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Use the links on the right of the Bid Package screen to access Plans, Special Provisions, and Attachments.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The appropriate screens are displayed.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Use the Go links to view the Federal Aid or Non-Federal funding reports.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The appropriate reports are displayed.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If desired, add comments to the bid package by selecting Bid Package Comment from the Add links and clicking the Add button.</td>
<td width="439">
<span style="font-family: Arial; font-size: 80%">The Bid Package Comment screen is displayed in create mode and allows you to enter and save a comment associated with the bid package. Use the BACK button to return to the Bid Package screen.</span>
<p><strong><em style="font-family: Arial; font-size: 80%">Note</em></strong><em style="font-family: Arial; font-size: 80%">: Comments have no affect on system processing.</em></p>
</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If desired, add conditions to the bid package by selecting Project Condition from the Add links and clicking the ADD button.</td>
<td width="439">
<span style="font-family: Arial; font-size: 80%">The Project Condition screen is displayed in create mode and allows you to enter and save a condition. Use the BACK button to return to the Bid Package screen.</span>
<p><strong><em style="font-family: Arial; font-size: 80%">Note</em></strong><em style="font-family: Arial; font-size: 80%">: Project Conditions affect system processing based on the Status you select. For example, if you create a condition with a status of &quot;Cannot open bids&quot;, the system will allow the project to be advertised but will not allow the bids to be opened until the condition status is updated to &quot;Satisfied&quot;.</em></p>
</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Click the GENERATE REPORT button.</td>
<td width="439" style="font-family: Arial; font-size: 80%">At any time after the bid package has been submitted, a draft of the Proposal Report .PDF's can be generated. A 'Pending Generation' label/link is visible while the system is creating and processing the files. Clicking on the link with display the Document Publishing Monitor that allows the user to monitor the progress of the process. When completed, document links appear that allow the user to view, download, or print one of the .PDF documents.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Click on the APPROVE button.</td>
<td width="439" style="font-family: Arial; font-size: 80%">A message is displayed asking you to confirm the approval.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Click OK on the message box.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The message box closes, and a 'please wait' message is displayed. When processing is complete, a 'successful message' is displayed.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Click OK on the message box.</td>
<td width="439">
<span style="font-family: Arial; font-size: 80%">The message box closes, and you are returned to the Bid Package screen. The status of the bid package has been updated to the next status in the workflow.</span>
<p style="font-family: Arial; font-size: 80%">If the project required QA by Central Office but did not require FHWA review, the updated status is &quot;Approved&quot;, and the bid package can be published. (The system generates and sends an email notification to the FHWA Approver assigned to the Project Team; if no approver has been assigned, the notification is sent to all FHWA Approver users in the system.)</p>
<p style="font-family: Arial; font-size: 80%">If the project required both QA and FHWA review, the updated status is &quot;FHWA&quot; review, and the bid package can be approved by FHWA. (The system generates and sends an email notification.)</p>
</td>
</tr>
</tbody>
</table>
<br /><br /> </blockquote>
</body>
</html>

Description

This function is part of the Electronic Bidding subsystem and is used by authorized PENNDOT and FHWA personnel to review and approve the plans, specifications, and estimate (that is, the "Bid Package" ) for a project. The need for prior approval of a bid package is dictated by a combination of the Federal Project Status and a manually set indicator on the project. The matrix below shows the workflow based on all possible combinations. Note that each time the user submits or approves the bid package, an email is generated and sent to the next user group in the workflow. If the user disapproves the bid package, it reverts to the previous status, and an email notification is generated and sent.

The Bid Package/Addenda Workflow screen tracks the user name, date, time, and disposition throughout the workflow process; it can be accessed via the Bid Package status link on the Bid Package screen.

The Approve Bid Package function can be accessed by the appropriate user group, depending on the Bid Package status. Users may access the Bid Package screen from the link contained in the notification email, from the Bid Packages by Status screen, or from the Go links of any project-related screen. The Approve button is only available to the user group corresponding to the workflow status.

While the bid package is in draft or review status, a draft Original (or Current) Proposal Report .PDF file can be generated on an ad-hoc basis by internal users. After publication, the Original Proposal Report .PDF document can be accessed by all users.

Approval Workflow

Federal Project Status
QA Indicator
Workflow (Status)
Federal Oversight
N/A
District creates bid package (Draft)
District submits to BOD CMD (BOD CMD Review)
BOD CMD Approves (FHWA Review)
FHWA Approves (Approved)
District or BOD CMD Publishes (Pending Publish)
PennDOT Oversight
No
District creates bid package (Draft)
Optional District Contract Management review (Draft)
District Publishes (Pending Publish)
PennDOT Oversight
Yes
District creates bid package (Draft)
District submits to BOD CMD (BOD CMD Review)
BOD CMD Approves (Approved)
District or BOD CMD Publishes (Pending Publish)
Non-Federal (State)
Yes
District creates bid package (Draft)
District submits to BOD CMD (BOD CMD Review)
BOD CMD Approves (Approved)
District or BOD CMD Publishes Pending Publish

Step-by-Step Directions

 

User Action Result
Navigate to the ECMS website. The ECMS Welcome page appears displaying the login link and the navigation bar on the left side.
Using the Registered Users Login fields at the top of the navigation bar, enter your user ID and password. Click GO or tap the Enter key. The ECMS Welcome page appears. Your user name now appears at the top of the navigation bar, and the navigation bar options are tailored to your security group(s).
Select the Contractor Services option from the Navigation bar. The Contractor Services options are displayed.
Select the eBidding option from beneath Contractor Services on the navigation bar. The Electronic Bidding home page is displayed.
Click the "Bid Packages by Status" link. The Bid Packages by Status screen is displayed.
Locate the Bid Package you want to review and click the associated "Project" number link to open the Bid Package The selected Bid Package screen is displayed.
Use the links on the right of the Bid Package screen to access Plans, Special Provisions, and Attachments. The appropriate screens are displayed.
Use the Go links to view the Federal Aid or Non-Federal funding reports. The appropriate reports are displayed.
If desired, add comments to the bid package by selecting Bid Package Comment from the Add links and clicking the Add button. The Bid Package Comment screen is displayed in create mode and allows you to enter and save a comment associated with the bid package. Use the BACK button to return to the Bid Package screen.

Note: Comments have no affect on system processing.

If desired, add conditions to the bid package by selecting Project Condition from the Add links and clicking the ADD button. The Project Condition screen is displayed in create mode and allows you to enter and save a condition. Use the BACK button to return to the Bid Package screen.

Note: Project Conditions affect system processing based on the Status you select. For example, if you create a condition with a status of "Cannot open bids", the system will allow the project to be advertised but will not allow the bids to be opened until the condition status is updated to "Satisfied".

Click the GENERATE REPORT button. At any time after the bid package has been submitted, a draft of the Proposal Report .PDF's can be generated. A 'Pending Generation' label/link is visible while the system is creating and processing the files. Clicking on the link with display the Document Publishing Monitor that allows the user to monitor the progress of the process. When completed, document links appear that allow the user to view, download, or print one of the .PDF documents.
Click on the APPROVE button. A message is displayed asking you to confirm the approval.
Click OK on the message box. The message box closes, and a 'please wait' message is displayed. When processing is complete, a 'successful message' is displayed.
Click OK on the message box. The message box closes, and you are returned to the Bid Package screen. The status of the bid package has been updated to the next status in the workflow.

If the project required QA by Central Office but did not require FHWA review, the updated status is "Approved", and the bid package can be published. (The system generates and sends an email notification to the FHWA Approver assigned to the Project Team; if no approver has been assigned, the notification is sent to all FHWA Approver users in the system.)

If the project required both QA and FHWA review, the updated status is "FHWA" review, and the bid package can be approved by FHWA. (The system generates and sends an email notification.)





Previous Page


Created byLast Modified by
Joseph D Howe/PennDOT
on 03/16/2005 at 10:48:04 AM
Wanda Taylor/PennDOT
on 03/18/2005 at 12:29:46 PM