Summary: | The presenters of the webinar will explain the challenges and opportunities associated with the design, construction, and ultimately the operation of an intersection in Pennsylvania that was converted to a complex Florida-T interchange. A Florida-T interchange provides left side deceleration and acceleration lanes for vehicles exiting and entering PA Route 28 leading to and from an intersection with a side street. This type of configuration allowed PA Route 28 motorists who are continuing past 40th Street to do so uninterrupted. This particular location also had another street (East Ohio Street) feeding vehicles into the system, which further complicated the design, construction, and operations.
|