Course Information
Class Schedule
General Information
Continuing Education Credits
Contact Us
<strong>It is recommended that attendees bring a calculator to class.</strong>
<p><strong><span style='font-size:11.0pt;line-height: 115%;font-family:"Calibri","sans-serif";mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font: minor-latin;mso-bidi-font-family:"Times New Roman";mso-bidi-theme-font:minor-bidi; color:blue;mso-ansi-language:EN-US;mso-fareast-language:EN-US;mso-bidi-language: AR-SA'>POST CLASS PROCESSING</span></strong> <span style='font-size:11.0pt; line-height:115%;font-family:"Calibri","sans-serif";mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font: minor-latin;mso-bidi-font-family:"Times New Roman";mso-bidi-theme-font:minor-bidi; color:blue;mso-ansi-language:EN-US;mso-fareast-language:EN-US;mso-bidi-language: AR-SA'>(06/26/13 dma):</span><span style='font-size:11.0pt;line-height:115%; font-family:"Calibri","sans-serif";mso-ascii-theme-font:minor-latin;mso-fareast-font-family: Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman";mso-bidi-theme-font:minor-bidi; mso-ansi-language:EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA'> <br /><span style="color:blue"> Grade tests<br /> Update LSO<br /> Send Class Summary Report to instructor and Donna Newell<br /> Mail PennDOT certificates<br style="mso-special-character: line-break" /><br style="mso-special-character:line-break" /></span></span></p>
Course:
Stormwater Design and NPDES Permits
SAP Course Number:
78TECH400389
Require fiscal data at the course level?
Course can be found when searching
"By Topic" under these categories:
Highway Design
Hydraulics and Hydrology
Class Schedule
No Offerings Are Currently Scheduled
Location
Start
End
Times
King of Prussia
04/14/15
04/17/15
Click class location for specific times.
Hollidaysburg
11/04/13
11/07/13
Click class location for specific times.
Harrisburg
01/28/13
01/31/13
Click class location for specific times.
Montoursville
11/07/11
11/10/11
Click class location for specific times.
King of Prussia
03/01/11
03/04/11
Click class location for specific times.
Hollidaysburg
04/13/10
04/16/10
Click class location for specific times.
Harrisburg
04/28/09
05/01/09
Click class location for specific times.
King of Prussia
12/09/08
12/12/08
Click class location for specific times.
Hollidaysburg
11/03/08
11/06/08
Click class location for specific times.
Harrisburg
09/08/08
09/11/08
Click class location for specific times.
General Information
Summary:
This course offers a comprehensive review of stormwater management concepts and design practices for highway applications. The primary focus of the course is the design procedures and acceptable stormwater best management practices that are described in PennDOT’s design manuals. Step-by-step instructions for completing an NPDES permit, including tips for developing a complete PCSM plan and narrative, are discussed in detail.
Learning Outcomes:
Upon completion of the course, participants will be able to:
1. Identify the significant hydrologic components of the water cycle that influence stormwater design.
2. Describe the significance of soil properties and the limiting conditions presented by certain geologic features.
3. Identify the stormwater design requirements for various types of projects per PennDOT’s Antidegradation and PCSM Policy.
4. Perform runoff calculations using the Rational equation and NRCS curve number methods.
5. Select the appropriate post-construction stormwater BMPs for managing a project’s runoff from PennDOT’s BMP Toolboxes.
6. Perform storage routing calculations for designing detention facilities.
7. Complete an NPDES Permit Application for Discharges Associated with Construction Activities.
8. Identify the required information and correct format of a PCSM plan and narrative.
Prerequisites:
Attendees must have an understanding of basic engineering concepts
Target Audience:
PennDOT and consultant project managers and design engineers who are responsible for the design, permitting, and scoping of projects involving stormwater management. The course is suitable for entry-level personnel and is a valuable refresher course for those with previous stormwater design experience. Project managers will gain valuable background on the NPDES permit process, how it relates to the new Antidegradation and PCSM Policy, and how it can impact the scope and schedule of a project.
Final Exam:
Yes
Continuing Education Credits
Miscellaneous
CEHs
Classes
After
CEUs
Classes
After
PDHs
Classes
After
PennDOT:
28.00
12/08/10
Awarding continuing education credits (PDH/CEU/CEH) to a training course or other training event does not imply or guarantee that the training course/event is approved by the Pennsylvania State Registration Board of Professional Engineers, Geologists and Land Surveyors.
According to Pennsylvania Act 25, “Credit determination for activities…shall be the responsibility of the licensee. Continuing professional competency obtained by a licensee should maintain, improve or expand skills or knowledge obtained prior to initial licensure, including law and ethics applicable to the profession, or develop new and relevant skills and knowledge.”
For informational purposes only:
1 CEU is equal to 10 hours of instruction
1 CEH is equal to 1 hour of instruction
Course Contact Information
For technical questions regarding this course, contact the following...
Name:
Kimberly Rice
Phone:
(717) 783-4722
Email:
kirice@pa.gov
For general questions about the Training Calendar (such as those regarding schedules,
locations, instructors or registrations), see Contact Information in specific classes.
Created
Last Modified
By
External Administrator
On
09/12/12
At
03:02 PM
By
Peggy A Trevenen/PennDOT
On
07/31/14
At
03:23 PM